Production Capacity

Lean production system with ISO9001 full-process control and 300,000 sets annual capacity.

Lean production management

KML breaks down LED lighting production into four core stages, ensuring precise implementation of each stage through node control and cross-departmental joint review.

01 02 03 04
01
01
Production preparation stage
01
Production preparation stage

Upon receiving an order, the production planning department clarifies the product model, quantity, and delivery schedule based on the requirements, formulates a detailed production plan, and simultaneously initiates precise material preparation. The warehousing department prepares materials according to the BOM list, with two people verifying the material model and quantity to prevent material errors from the outset.

02
02
Production line start-up review
02
Production line start-up review

● Production Department: Assign operational personnel, prepare work instructions, and clarify production execution standards;
● Quality Control Department: Provides inspection standards and sets quality acceptance standards;
● Equipment group: Completes the debugging and placement of machines, tooling, and testing equipment;
Trial production can only begin after the three parties jointly confirm and approve the project, thus mitigating potential risks from the outset.

03
03
First item verification
03
First item verification

We will first produce 3-5 samples for trial production, where technicians will verify the accuracy of the parameters and the operability of the instructions. The production department will check the consistency between the actual operation and the standards, and verify key processes such as light source welding and driver power supply assembly. Next, the quality control department will test all parameters, including luminous flux, color temperature, color rendering index, SDCM, and electrical safety, and keep records. Mass production can only begin after all three parties have signed and confirmed the results.

04
04
Mass production and quality control
04
Mass production and quality control

After the initial sample inspection, production proceeds according to standardized procedures. IPQC inspects key workstations every 2 hours to capture production deviations in real time. If any non-conformity is found, the machine will be stopped immediately, and the process, quality control, and production departments will jointly analyze the cause. After rectification, the first piece verification will be carried out again to ensure that the problem "does not flow into the next process".

Standardized production process

KML lighting fixtures are manufactured in accordance with the ISO9001 quality management system, and every step of the standardized process reflects the meticulousness and professionalism of the production team.

SMT & electronics

SMT & electronics

Driver and control board assembly.

Optical assembly

Optical assembly

Lens and reflector mounting lines.

Structural assembly

Structural assembly

Housing, sealing, and mounting kits.

Aging room

Aging room

Burn-in validation before shipment.

Packaging

Packaging

Shock-proof packing for export.

Warehouse

Finished goods readiness for multi-modal shipping.

Let KML Boost Your Business Today

Our professional team will provide one-on-one support throughout your project, providing seamless service from concept design to installation, ensuring a smooth and worry-free process. Get started now!

Requirements Communication Requirements Communication
Solution Design Solution Design
Sample Production Sample Production
Shipping and Delivery Shipping and Delivery